The speed of an international assessment depends almost entirely on the completeness of the initial information.
Useful documents: elevation drawings or site plans, recent condition photographs, material specifications, facility safety rules and any previous maintenance reports.
For tenders, add the tender documents, certification and insurance requirements, and the submission timetable.
Where information is confidential, exchange can follow the signature of a confidentiality agreement.